Since 2004
Kitchens, bathrooms and additions, on a written schedule
Designed and built by one company for homes in Honeoye Falls, Mendon, Pittsford and nearby towns. A fixed price and a week-by-week schedule before any work starts, and one lead carpenter from demolition to the walk-through.
- Insured for $2 million
- EPA Lead-Safe Certified Firm NAT-F218843-1
- One-year warranty in writing
- $150 a day if we finish late
Recent jobs
Each with its town and how long it took on site.
What we build, and what it costs
Starting prices from our recent projects. Your price is fixed in the contract once the design is done.

Kitchens
New layouts, cabinets, counters, lighting and floors, with plumbing and electrical by licensed trades we’ve used for years.
From $45,0006 to 10 weeks on site
Not included: appliances, unless you ask us to order them

Bathrooms
Tiled showers, tubs, vanities and heated floors, and tub-to-shower conversions.
From $22,0003 to 4 weeks on site
Not included: moving a drain through a concrete slab

Additions
Family rooms, primary suites and mudrooms, built to match the roofline, siding and trim you already have.
From $300 a sq ft3 to 5 months
Not included: the survey, and a variance if the town asks for one

Decks
Pressure-treated, cedar or composite, with the stairs, railings and lighting built in.
From $55 a sq ft1 to 2 weeks
Not included: taking out an old deck’s concrete footings

Porches
Covered and screened porches, and front porches rebuilt on older houses.
From $25,0003 to 5 weeks
Not included: painting and staining

Design
Measured drawings, 3D views, and every material chosen before the price is fixed. The fee comes off the build.
$2,5004 to 8 weeks
How a project runs
Six steps. If you stop after the design, the drawings are yours to keep.
-
A first visit
An hour at your house with Nate, free, within two weeks of your call. You’ll come away with a rough range for what you’re describing.
-
Design and selections
Four to eight weeks of drawings, 3D views, and every cabinet, tile and fixture chosen. The $2,500 design fee comes off the build.
-
A fixed price and a schedule
One contract price that holds for 60 days, and a week-by-week schedule with a start date and a finish date. 10% when you sign.
-
Materials in first
Cabinets, tile and fixtures arrive and are checked before anything is torn out.
-
The build
A lead carpenter on site every working day, who sweeps up and seals the dust walls before leaving. Call your lead with anything; Nate emails photos every Friday.
-
The final walk-through
We finish everything on your list, close the permit and hand you a one-year warranty in writing.
Our schedule guarantee
$150 off the bill for every day we run late
The finish date is in your contract. If we miss it for a reason that’s ours, $150 comes off the final payment for each working day.
Changes you ask for, late deliveries of materials you chose, and inspections the town moves all shift the date, and we agree the new one in writing.
Who runs your job
Eight carpenters on our own payroll. You meet your lead carpenter before demolition, and the same one is there at the walk-through.
-
Nate Hollister
Owner
Framed houses for a builder in Victor for ten years before starting Hollow Creek in 2004. Does every first visit, and writes the Friday emails.
-
Owen Lacey
Lead carpenter
With us since 2009. Kitchens and baths, and the tile work in most of them.
-
Jess Morrow
Lead carpenter
Joined in 2014. Runs the additions and the porches, rooflines and all.
-
Dana Kerr
Design
Draws the plans and the 3D views, and goes to the showrooms with you for the selections.
-
2004
started in Honeoye Falls
-
25
projects finished in a typical year
-
8
carpenters on our own payroll
Building next year?
Our calendar fills about six months ahead, so a porch for June starts with a visit by January.










