Kitchen remodels with the finish date in the contract

Most kitchens take six to ten weeks on site, after four to six weeks of design. The price and the finish date are set before the old cabinets come out.

4.9 on Google · 52 reviews

Before demolition

Cabinets take eight to twelve weeks to arrive, so everything is ordered and checked before demolition. Your kitchen isn’t torn out while a part sits on back order.

While we work, you get a temporary kitchen with your refrigerator, a microwave and a sink, usually in the dining room or the garage.

Every kitchen includes

  • Measured drawings and 3D views
  • Plumbing and electrical by licensed trades
  • Permits pulled and closed in our name
  • A temporary kitchen while yours is built
  • Dust walls between the work and the rest of the house

Questions

Can we stay in the house?

Almost everyone does. The kitchen is sealed off with dust walls, an air scrubber runs all day, and the crew uses one door.

Do you supply the cabinets?

Yes, from three cabinet lines at different prices, or we install ones you’ve bought. Counters are made by a fabricator in Henrietta we’ve used since 2009.

What does a kitchen cost?

Most of ours have come in between $45,000 and $90,000. Cabinets and counters are usually about half of it.

Planning a new kitchen?

Design takes four to six weeks, so a kitchen for next spring starts with a visit this winter.

Book a first visit

Tell us what you’re planning and roughly when. Nate calls back within two working days to set up a visit.

Service area
Honeoye Falls, Mendon, Pittsford and towns within 25 miles

Hours

Mon–Fri7 am – 4 pm
Sat, SunClosed

Evening and Saturday design meetings by appointment

Hours confirmed October 2026

Get a quote

What can we do?

Leave a phone number, an email, or both.

The first visit is free and takes about an hour. The fixed price follows the design.